Item 523684 model rab17.
Build sheet metal plenum.
Contact a location arizona lake havasu city arizona 928 846 8707 peoria arizona 480 385 1380 california anaheim california 714 933 1777 chatsworth california 818 884 1100 chino california 909 267 1124 el cajon california 619 566 8130 escondido california 760 233 2545 la habra california 562 257 1133 laguna hills california 949 598 8333 oceanside california 760 797 6234.
If your installation location is difficult to reach with.
A plenum is an air distribution box attached directly to the supply outlet of the hvac equipment that heats or cools the air to make the house comfortable.
Hamilton 20 5 in x 17 5 in x 28 in return air box assembly duct plenum.
Ducting sheet metal.
Fold the ends of the foil onto the outside of the duct board.
844 289 0033 after hours emergency contact.
I picked 3 16 wall which is almost 5mm thick.
The trim to fit plenum fully assembled measures 20 in.
Plenums and transitions.
Secure the end caps to the plenum.
Constructed of 26 gauge sheet metal the knock down design of the plenum takes up very little space and simplifies transporting to the job site.
All product lines.
25 feet should it be ductboard or metal and is hard pipe runs preferable over flex.
We offer the starting ductwork for furnaces and air handlers called supply air plenums and return air plenums.
The most common grade of aluminum metal suppliers sell is 6061 usually in t6 temper.
But andreas from ppf warned me that in his experience if you use less than 4mm thick aluminum the plenum will eventually crack plastic might be weaker but it doesn t fatigue the way metal does.
The trim to fit plenum fully assembled measures 20 in.
And is designed for use with all heating and cooling applications.
Duct board vs metal plenums supply is on perferable over the other.
If i am going to have a supply plenum run for approx.
Tape the flaps down with foil tape to complete the duct board.
In addition we offer take offs elbows round duct pipe and register boots that can be connected to the starting ductwork and run to each room.
D x 47 in.
Staple the foil to the duct board.
Push the cut pieces in each open end of the plenum.